当前分类: IBM(000-106)
问题:单选题A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows. Which of the following design consideration statements is correct?()A T...
查看答案
问题:单选题A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will h...
问题:单选题What is the primary purpose of the Technical and Delivery Assessment (TDA)?()A Identify, assess, and mitigate technical risks.B Verify pricing and gather components for special bid submission.C Verify the proposed solution will fit within the customer'...
问题:单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirem...
问题:单选题On a POWER7 processor based server what is the minimum number of cores used by the Hypervisor to run four threads?()A 1B 2C 4D 8...
问题:单选题A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()A An HMC is required for dual VIO servers.B Dual VIO servers require a split backplane.C A dual VIO...
问题:单选题A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()A PowerVM offers partition mobility.B PowerVM can virtualize network and SAN resources.C PowerVM suppo...
问题:单选题A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()A CoD and PCI hot-plugB DLPAR and Active Memory SharingC Hot node add and hot node ...
问题:单选题A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools. What is the minimum PowerVM E...
问题:单选题Which data synchronization options between two geographical locations are supported by PowerHA SystemMirror?()A Parallel and SerialB Serial and AsynchronousC Parallel and SynchronousD Synchronous and Asynchronous...
问题:单选题What are key benefits of IBM Systems Director Standard Edition?()A Backup data Manage problems Monitor network systemB Report problems Manage servers and virtual environment Monitor the network C Monitor system health and network Install and manage AIX...
问题:单选题A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()A...
问题:单选题What describes the difference between NPIV and vSCSI in the way fibre-channel attached disk and tape are presented when VIO Server is used?()A NPIV presents Virtual HBA addresses and vendor specific information for disk and tape devices.vSCSI presents ...
问题:单选题A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance. Which of the following solutions will ...
问题:单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A The new system requires 1 installed processor card for the GX++ bus adapterB The new system requires a min...
问题:单选题A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()A Verification of the expected performance of the new solution.B...
问题:单选题A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing lim...
问题:单选题What is an advantage of using an HMC rather than IVM for system management?()A Support for a single VIO Server environmentB Adapters can be dedicated or virtual for each LPAR environmentC Interfaces with Systems Director to manage the Power Systems ser...