当前分类: SK0-002
问题:单选题Which factor has the greatest impact on the estimated per unit labor cost for a project?()A Historical informationB Use of outside vendorsC Change control processesD Human resource skill level requirements...
查看答案
问题:多选题Which three should be documented after upgrading a SCSI RAID controller?()Adisk utilizationBinstallation dateCadapter baselinesDlocation slot of the RAID controllerEstatus of the adapter card installationFRAID controller information (warranty, specific...
问题:单选题What is the role of the line manager in a project plan?()A Provide resources to a projectB Request requirements changesC Resolve team conflictsD Control the project budget...
问题:单选题The project sponsor wants the project manager to develop and implement Quality Management techniques to ensure a smooth project transition to the deployment phase. What is an appropriate Quality Management technique to implement?()A Evaluate phase exit...
问题:单选题As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()A Up to 5B Up to 10C Up to 15D Up to 20...
问题:单选题A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made. The existing 512 MB of SDRAM is replaced with 1024 MB. Th...
问题:单选题A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which b...
问题:单选题Which of the following SCSI signaling systems uses one return line for every outgoing line, is less susceptible to interference, signal degradation, crosstalk, and allows a cable length of up to 25 meters?()A SE (Single Ended)B DE (Double Ended)C LV...
问题:单选题A technician purchases a new 120 GB IDE hard disk to use in an old server as a swap drive. After adding the drive to the server, the technician discovers that the operating system does not detect the drive. After rebooting the server, the technician ...
问题:单选题Team member listing, scheduled tasks, and risk identification are part of the:()A project plan.B project charter.C communication plan.D WBS (Work Breakdown Structure)....
问题:单选题Within Information Technology projects, communications between the project manager and the project team members should take place:()A by written and oral communication.B via a weekly status report.C through the formal chain of command.D with approved t...
问题:单选题Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()A multiple AIT (Advanced Intelligent Tape) drives configured for each serverB a standalone LTO (Linear ...
问题:单选题Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()A Developing key personnelB Leading technical specialistsC...
问题:单选题Why is it important to have a final meeting on a project that has been cancelled?()A Document lessons learnedB Assign responsibilityC Close budgetD Begin new project...
问题:单选题Which type of server is responsible for resolving NetBIOS names?()A mail serverB DNS serverC web serverD WINS serverE DHCP server...
问题:单选题If the organizational spending plan has allocated $100,000 for a project, and the high level budget estimate for that project is $200,000; which of the following is accurate?()A The high level budget estimates are inaccurateB The organizational spendin...