当前分类: IBM(000-087)
问题:单选题In which phase should a TDA be performed?()A Server deployment B Installation and server configuration C Problem determination/resolution D Needs analysis and design...
查看答案
问题:单选题A customer has downloaded new firmware files for the IBM support Web Site. Which of the following is the correct method for updating the firmware for the QLogic Intelligent Passthru Module using the command line?()A Transfer the file to the FC module u...
问题:单选题A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports an HS22 blade server can support if the blade does not have an...
问题:单选题A Customer has a proprietary server deployment solution that uses a combination of disk imaging and application pushing technology. They need to get a working Windows 2003 image for their new servers as soon as possible for deployment with their provi...
问题:单选题A prospective customer has selected Fiber Channel (FC) for performance reasons. The prospect does not appear to understand the terminology and options of the fiber channel but is very interested in learning before investing money in this technology.Wh...
问题:单选题A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which ...
问题:单选题A customer plans to deploy Open Fabric Manager (OFM). Which vendors would you recommend?()A Brocade B Blade Network Technology (BNT) C Cisco D Juniper...
问题:单选题A healthcare customer is not satisfied with the utilization of their heterogeneous storage devices. Which of the following solutions should the System x technical representative recommend to better provision their storage on demand?()A Tivoli Storage M...
问题:单选题A banking customer has two Ethernet Switch Modules installed in an IBM BCE chassis. The modules were configured identically. The Ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customer-spec...
问题:单选题An eX5 client is concerned about the cost-per-GB of the proposed SAS disk-based solution, and suggests using SATA disk technology in order to reduce costs for their 24x7 mission-critical Microsoft SQL Server application. Which of the following addresse...
问题:单选题A mechanical contractor is deploying a custom application written to take advantage of multithreading features and run in a Windows environment. The customer has read about iDataPlex, BladeCenter, and System x servers. The customer wants to know which ...
问题:单选题Which of the following is the correct procedure to update the BIOS on LS42 blades without using the AMM?()A Insert the Update eXpress Service Pack Installer (UXSPI) CD, boot the LS42 blade and follow the prompts B Boot the blade to the Bootable Media C...
问题:单选题A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following ...
问题:单选题A medical customer has an installed HS21 blade with no local disk. They are attempting to set up boot from SAN using a Windows 2003 CD. Which sequence is correct for this procedure? ()A Install Windows from the CD using the QLogic driver provided on th...
问题:单选题A client is experiencing bottlenecks in their IT environment.Which of the following responses address this issue?()A Meet with Operations Manager B Perform Scorpion study C Meet with CFO D Perform CDAT study...
问题:单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following...
问题:单选题When selling against competition, which of the following focus on the iDataPlex value proposition? ()A Superior chip density B Balance performance, cost, and power+cooling efficiency C Flexible configurations ready for integration and testing at the cu...