单选题The Eos authors claim all of the following EXCEPT that _____.A the possible higher frequency of flood raises concerns about dam safetyB conventional dam design hasn’t realized the possible feedback mechanismsC dam design protocol shouldn’t assume uncha

题目
单选题
The Eos authors claim all of the following EXCEPT that _____.
A

the possible higher frequency of flood raises concerns about dam safety

B

conventional dam design hasn’t realized the possible feedback mechanisms

C

dam design protocol shouldn’t assume unchanging extreme precipitation events

D

the dams’ function has been weakened mainly because it is getting older


相似考题

4.1 Rowlands & Medeleev (R&M), a major listed European civil engineering company, was successful in its bid to becomeprincipal (lead) contractor to build the Giant Dam Project in an East Asian country. The board of R&M prided itself inobserving the highest standards of corporate governance. R&M’s client, the government of the East Asian country, hadtaken into account several factors in appointing the principal contractor including each bidder’s track record in largecivil engineering projects, the value of the bid and a statement, required from each bidder, on how it would deal withthe ‘sensitive issues’ and publicity that might arise as a result of the project.The Giant Dam Project was seen as vital to the East Asian country’s economic development as it would provide alarge amount of hydroelectric power. This was seen as a ‘clean energy’ driver of future economic growth. Thegovernment was keen to point out that because hydroelectric power did not involve the burning of fossil fuels, thepower would be environmentally clean and would contribute to the East Asian country’s ability to meet itsinternationally agreed carbon emission targets. This, in turn, would contribute to the reduction of greenhouse gasesin the environment. Critics, such as the environmental pressure group ‘Stop-the-dam’, however, argued that theproject was far too large and the cost to the local environment would be unacceptable. Stop-the-dam was highlyorganised and, according to press reports in Europe, was capable of disrupting progress on the dam by measures suchas creating ‘human barriers’ to the site and hiding people in tunnels who would have to be physically removed beforeproceeding. A spokesman for Stop-the-dam said it would definitely be attempting to resist the Giant Dam Project whenconstruction started.The project was intended to dam one of the region’s largest rivers, thus creating a massive lake behind it. The lakewould, the critics claimed, not only displace an estimated 100,000 people from their homes, but would also floodproductive farmland and destroy several rare plant and animal habitats. A number of important archaeological siteswould also be lost. The largest community to be relocated was the indigenous First Nation people who had lived onand farmed the land for an estimated thousand years. A spokesman for the First Nation community said that the ‘trueprice’ of hydroelectric power was ‘misery and cruelty’. A press report said that whilst the First Nation would be unlikelyto disrupt the building of the dam, it was highly likely that they would protest and also attempt to mobilise opinion inother parts of the world against the Giant Dam Project.The board of R&M was fully aware of the controversy when it submitted its tender to build the dam. The financedirector, Sally Grignard, had insisted on putting an amount into the tender for the management of ‘local risks’. Sallywas also responsible for the financing of the project for R&M. Although the client was expected to release money inseveral ‘interim payments’ as the various parts of the project were completed to strict time deadlines, she anticipateda number of working capital challenges for R&M, especially near the beginning where a number of early stage costswould need to be incurred. There would, she explained, also be financing issues in managing the cash flows to R&M’smany subcontractors. Although the major banks financed the client through a lending syndicate, R&M’s usual banksaid it was wary of lending directly to R&M for the Giant Dam Project because of the potential negative publicity thatmight result. Another bank said it would provide R&M with its early stage working capital needs on the understandingthat its involvement in financing R&M to undertake the Giant Dam Project was not disclosed. A press statement fromStop-the-dam said that it would do all it could to discover R&M’s financial lenders and publicly expose them. Sallytold the R&M board that some debt financing would be essential until the first interim payments from the clientbecame available.When it was announced that R&M had won the contract to build the Giant Dam Project, some of its institutionalshareholders contacted Richard Markovnikoff, the chairman. They wanted reassurance that the company had fullytaken the environmental issues and other risks into account. One fund manager asked if Mr Markovnikoff couldexplain the sustainability implications of the project to assess whether R&M shares were still suitable for hisenvironmentally sensitive clients. Mr Markovnikoff said, through the company’s investor relations department, that heintended to give a statement at the next annual general meeting (AGM) that he hoped would address theseenvironmental concerns. He would also, he said, make a statement on the importance of confidentiality in thefinancing of the early stage working capital needs.(a) Any large project such as the Giant Dam Project has a number of stakeholders.Required:(i) Define the terms ‘stakeholder’ and ‘stakeholder claim’, and identify from the case FOUR of R&M’sexternal stakeholders as it carries out the Giant Dam Project; (6 marks)

更多“单选题The Eos authors claim all of the following EXCEPT that _____.A the possible higher frequency of flood raises concerns about dam safetyB conventional dam design hasn’t realized the possible feedback mechanismsC dam design protocol shouldn’t assume uncha”相关问题
  • 第1题:

    A network design shows that R1 has four different possible paths from itself to the Data Center subnets.Which one of the following commands is most likely to show you all the possible next - hop IP addresses for these four possible routes?()

    A. show ip eigrp topology

    B. show ip eigrp topology all - links

    C. show ip route eigrp

    D. show ip route eigrp all - links

    E. show ip eigrp topology all - learned


    参考答案:B

  • 第2题:

    4.It __________ eight years to build the Dam(大坝) from 1998 t0 2006.

    A.spends

    B.costs

    C.paid

    D.took


    正确答案:D

  • 第3题:

    Which of the letter"a"in the following words has a different pronunciation from others?

    A.base
    B.sake
    C.lame
    D.dam

    答案:D
    解析:
    考查开音节单词发音。根据开音节发音定义可知,单个元音字母后面加个辅音字母,再加一个不发音的字母e构成的重读音节为开音节单词。而在开音节中元音字母发本音,所以A、B、C三项都是开


  • 第4题:

    Mr. Black was in the __________, standing there dumbfounded, not knowing what to do.

    A.dark
    B.dusk
    C.dawn
    D.dam

    答案:A
    解析:
    句意为布莱克先生不知就里,站在那里目瞪口呆,不知怎么办好。in the dark意为“在黑暗中,不知情,蒙在鼓里”;dusk意为“薄暮,黄昏”;dawn意为“黎明,破晓”;dam意为“大坝”。

  • 第5题:

    重力坝(gravity dam)


    正确答案: 主要依靠自身重量抵抗水的作用力等荷载以维持稳定的坝。

  • 第6题:

    自然堤(natural dam)


    正确答案: 沿河床两侧常产生堤状地形,称为自然堤(natural dam)。

  • 第7题:

    关于事故分类中的DAM,哪项说法是不正确的?()

    • A、它的完整写法是Damageinc ident
    • B、它指的是财产损失事件
    • C、DAM事件中肯定也伴随其他伤害事故的发生
    • D、DAM事件属于负面HSSE指标

    正确答案:C

  • 第8题:

    何谓DAM方式?说明它的适用场合。


    正确答案: 定义:由DMA控制器控制系统总线,直接依靠硬件实现主存与I/O设备之间的数据直传,传送期间不需要CPU程序干预。
    适用场合:高速、批量数据的简单传送。

  • 第9题:

    名词解释题
    自然堤(natural dam)

    正确答案: 沿河床两侧常产生堤状地形,称为自然堤(natural dam)。
    解析: 暂无解析

  • 第10题:

    单选题
    Refer to the exhibit. A network technician is asked to design a small network with redundancy. The exhibit represents this design, with all hosts configured in the same VLAN. What conclusions can be made about this design?()
    A

    The design will function as intended

    B

    Spanning-tree will need to be used.

    C

    The router will not accept the addressing scheme.

    D

    The connection between switches should be a trunk.

    E

    The router interfaces must be encapsulated with the 802.1Q protocol.


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    Normal pool elevation is the height in feet of the section of river above a dam. This height is measured from().
    A

    low steel on the Huey P. Long Bridge

    B

    mean sea level

    C

    the local water table

    D

    the minimum dam control level


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A current moving across a lock entrance toward the river or toward the dam is called a(n)().
    A

    cutoff

    B

    outdraft

    C

    lockwash

    D

    springpool


    正确答案: B
    解析: 暂无解析

  • 第13题:

    Refer to the exhibit. A network technician is asked to design a small network with redundancy. The exhibit represents this design, with all hosts configured in the same VLAN. What conclusions can be made about this design?()

    A.The design will function as intended

    B.Spanning-tree will need to be used.

    C.The router will not accept the addressing scheme.

    D.The connection between switches should be a trunk.

    E.The router interfaces must be encapsulated with the 802.1Q protocol.


    参考答案:C

  • 第14题:

    Normal pool elevation is the height in feet of the section of river above a dam. This height is measured from ______.

    A.low steel on the Huey P. Long Bridge

    B.mean sea level

    C.the local water table

    D.the minimum dam control level


    正确答案:B

  • 第15题:

    When a teacher makes a lesson plan, he should do all of the following EXCEPT_____________

    A.design techniques that have easy and difficult aspects of items
    B.try to design techniques that involve all students
    C.take into consideration the different demands and needs of all students
    D.cater only to the top range students to make sure the progress of teaching

    答案:D
    解析:
    考查教学设计。教师在进行教学设计时,应考虑到大多数学生的水平,并根据不同类型学生的特点设计出难易结合的教案.故选D。

  • 第16题:

    He hasn't the funds to carry out his design.

    A:make
    B:keep
    C:change
    D:implement

    答案:D
    解析:
    题干意为“他没有资金来施行他的计划。” 句中划线词的意为“实施”。D项implement意为“使生效,履行,实施”,例:We need moeey to implement the program.我们需要钱来实行这个计划。A项意为“做,制造”。B项意为 “保持”。C项意为“改变”。故选D。

  • 第17题:

    拱坝(arch dam)


    正确答案: 在平面上拱向上游将荷载主要传递给两岸的曲线型坝。

  • 第18题:

    终碛堤(termina lmoraine dam)


    正确答案: 终碛堤是冰川前端由冰碛物构成的弧形高地。它是在冰川的补给与消融处于平衡时,因冰川前端的位置固定,冰川搬运的物质不断运送到冰川前端堆积而成。终碛堤的位置指示冰川前缘所到的边界,也是冰川前端停顿地点的识别标志。

  • 第19题:

    A network design shows that R1 has four different possible paths from itself to the Data Center subnets. Which one of the following commands is most likely to show you all the possible next - hop IP addresses for these four possible routes?()

    • A、show ip eigrp topology
    • B、show ip eigrp topology all - links
    • C、show ip route eigrp
    • D、show ip route eigrp all - links
    • E、show ip eigrp topology all - learned

    正确答案:B

  • 第20题:

    单选题
    The dam was built along the river ______ floods.
    A

    in any case

    B

    in case of

    C

    in no case

    D

    in case


    正确答案: B
    解析:
    句意:堤坝沿河而建,以防出现洪灾。in any case意为“无论如何,总之”;in case of意为“若发生某事”,如In case of fire,ring the alarm bell. 意为“遇火警时要按警铃”;in no case意为“无论如何都不”;in case意为“以防万一”,一般说Take an umbrella in case it rains. 意为“带把伞,以防万一下雨。”

  • 第21题:

    单选题
    The Eos authors claim all of the following EXCEPT that _____.
    A

    the possible higher frequency of flood raises concerns about dam safety

    B

    conventional dam design hasn’t realized the possible feedback mechanisms

    C

    dam design protocol shouldn’t assume unchanging extreme precipitation events

    D

    the dams’ function has been weakened mainly because it is getting older


    正确答案: D
    解析:
    事实细节题。由文章最后一句可知,导致大坝不再安全的因素有很多,大坝的年龄只是其中之一,所以D“大坝功能的削弱主要是因为它正变得更旧”与文章意思不符,为正确答案。

  • 第22题:

    问答题
    Practice 4  Few creations of big technology capture the imagination like giant dams. Perhaps it is humankind’s long suffering at the mercy of flood and drought that makes the ideal of forcing the waters to do our bidding so fascinating. But to be fascinated is also, sometimes, to be blind. Several giant dam projects threaten to do more harm than good.  The lesson from dams is that big is not always beautiful. It doesn’t help that building a big, powerful dam has become a symbol of achievement for nations and people striving to assert themselves. Egypt’s leadership in the Arab world was cemented by the Aswan High Dam. Turkey’s bid for First World status includes the giant Ataturk Dam.

    正确答案:
    【参考译文】
    重大技术的创造中,几乎没有哪个比巨型大坝更令人心驰神往。也许正是由于人类长期遭受旱涝之灾才使得让洪水听从人的调遣这种理想如此令人痴迷。但使人痴迷有时也就使人盲目。有几个巨型大坝项目可能弊大于利。
    从堤坝中获得的教训是,大的并不总是美的。对于那些在努力显示自身力量的国家和人民,建一个功能强大的大水坝标志着他们取得了成就,然而修建大坝并没有什么实际作用。埃及的阿拉伯世界的领导地位因阿斯旺大坝得以巩固和加强,土耳其在其争取跻身于第一世界的努力中也包括建造阿搭特克大坝。
    解析: 暂无解析

  • 第23题:

    问答题
    何谓DAM方式?说明它的适用场合。

    正确答案: 定义:由DMA控制器控制系统总线,直接依靠硬件实现主存与I/O设备之间的数据直传,传送期间不需要CPU程序干预。
    适用场合:高速、批量数据的简单传送。
    解析: 暂无解析

  • 第24题:

    单选题
    A network design shows that R1 has four different possible paths from itself to the Data Center subnets. Which one of the following commands is most likely to show you all the possible next - hop IP addresses for these four possible routes?()
    A

    show ip eigrp topology

    B

    show ip eigrp topology all - links

    C

    show ip route eigrp

    D

    show ip route eigrp all - links

    E

    show ip eigrp topology all - learned


    正确答案: B
    解析: 暂无解析