第1题:
In order to support Live Partition Mobility (LPM) for a given LPAR between two Power servers, which type of backing device should be chosen for the storage devices presented from the VIO server to the LPAR?()
第2题:
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
第3题:
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
第4题:
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()
第5题:
A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()
第6题:
A client has a temporary deployment of a new static application that needs to run for a short period of time and is not going to change. How can this deployment be achieved with a minimum of effort and time?()
第7题:
Run a system WPAR and deploy the application.
Create a new LPAR and deploy the application.
Create an application WPAR to deploy the application.
Create an LPAR hosted by a VIO server and deploy the application.
第8题:
The LPAR Configuration backup is corrupt
The LPAR Configuration has been altered using DLPAR
The LPAR Configuration backup was performed on a different HMC
The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed
第9题:
4
8
16
32
第10题:
Create a dedicated LPAR for the existing workload and a Micro-Partition for the Web server.
Create a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.
Create a Micro-Partition for the existing workload and a Micro-Partition for the Web server.
第11题:
The application server,firewall,and database server on the same VLAN
The application server and firewall on one VLAN,and the database server on a second VLAN
The application server on one VLAN,and the database server and firewall on a second VLAN
The application server and firewall on one VLAN,and the firewall and database server on a second VLAN
第12题:
In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.
In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.
In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.
In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.
第13题:
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
第14题:
An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()
第15题:
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
第16题:
A user has an application server LPAR with a physical Ethernet adapter. They want to have a database LPAR also connected to the application LPAR via virtual Ethernet. Their security policies require a firewall between the application LPAR and database LPAR. Which of the following virtual Ethernet configurations satisfies the customer’s requirements?()
第17题:
System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()
第18题:
'pc' refers to the number of physical processors consumed, while 'ec' refers to the percentage of entitled capacity consumed.
'pc' refers to the 'physical CPUs' and lists how many are left un-allocated, while ec' refers to the 'entitled CPUs' and lists what amount is currently allocated to the LPAR.
'pc' refers to the 'processor count' and reflects how many CPUs are allocated to the LPAR, while 'ec ' refers to the 'extra capacity' and lists how much above the LPAR entitlement is being consumed.
'pc' refers to 'processor cards' and reflects how many MCM modules are actually being used by this LPAR, while 'ec' refers to the 'entitled CPUs'and lists what amount is currently allocated to the LPAR.
第19题:
8 desired processing units and 8 desired virtual processors
2 desired processing units and 8 desired virtual processors
8 desired processing units and 32 desired virtual processors
2 desired processing units and 32 desired virtual processors
第20题:
VIO Server
AIX 5.2 ML4
Shared Ethernet Adapter
AIX 5.3 with Advanced Power Virtualization
第21题:
PowerVM offers partition mobility.
PowerVM can virtualize network and SAN resources.
PowerVM supports multiple operating systems running concurrently.
PowerVM allows an LPAR to use activated cores and memory without limitation.
第22题:
The Power 550 is licensed for three LPARs only.
There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.
There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory to perform logical partition tasks.
There is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.
第23题:
0
1
255
256
第24题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs