问题:多选题A customer has a mixed Dell and IBM server environment. They want to implement a system management solution for all their Windows, Linux, and VMWare ESX Intel based servers. Which TWO features of IBM Director will be an advantage for this customer?()...
查看答案
问题:单选题A customer wants to deploy VMWare ESX on four-way Intel systems. They are considering IBM and Dell.Which of the following is an advantage IBM has over the competition?()A IBM provides optional Remote Technical Support for hardware, NOS, and VMWare.B T...
问题:单选题A customer has a small SAN with both Linux and Windows servers attached to a DS4300 storage server through a redundant fabric. Which of the following is the most important consideration to ensure that this configuration would function properly?()A The ...
问题:多选题An HP customer is looking for an enterprise type of Intel-based server for a mission-critical database server.What are the TWO major differentiators of an x445 over the HP DL740/DL760?()AHot-plug PCI-XBRemote I/O expansionCMaximum 64GB RAM for 8-wayDOn...
问题:单选题A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers. The current environment is direct attached storage. The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years a...
问题:单选题A 2-way interleaved DDR configuration and a 4-way interleaved SDRAM configuration will produce which of the following?()A They will have the same memory bandwidth.B 2-way will provide higher memory bandwidth than 4-way.C 4-way will provide higher memor...
问题:单选题An application vendor wants to choose a fault tolerant platform for their new application. The application benefits from multiple processors and has been tested on Red Hat Advanced Server 3. To determine the memory requirements for the application, w...
问题:多选题A company wants to consolidate 20 existing dual processor Pentium III servers, all running a web server application on Windows Server 2003. They are considering consolidating to a single x445 running VMWare ESX. Which TWO of the following questions w...
问题:单选题The statistics for a poorly performing, dual-processor x365 system are as follows: (1)Processor: 80% for 5-second increments (2)Memory page faults: 360/second average over 15 minutes (3)Disk % disk time: 100% Which of the following will p...
问题:单选题An xSeries specialist monitors a customer’s server that has poor performance. The customer is running an x365 with a ServeRAID 6i controller with write-back cache turned on and ten 15K rpm drives in a RAID-5 array. It is a mission-critical server and...
问题:单选题Which of the following x366 8GB memory configurations will produce the best performance?()A One memory card with four 2GB DIMMsB Two memory cards with four 2GB DIMMsC Two memory cards with eight 1GB DIMMsD Four memory cards with eight 1GB DIMMs...
问题:单选题A customer has a Linux server farm and wants to use IBM Director to manage all of their systems. Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?()A Install Director Server on a Windows 2000 Serve...
问题:单选题A network administrator wants to analyze the historical performance of the servers in the organization and forecast the system performance needs into the future. Which add-on component of IBM Director would be used to assist with this task?()A Capacit...
问题:单选题While upgrading an existing x445 with a second SMP expansion module and four processors, a technician notices the SMP connector cables are missing on the back, so the technician connects the cables. Upon powering up, the technician notices the upper S...
问题:单选题A customer wants to deploy the latest ServeRAID driver and firmware updates to 25 servers on their LAN. This needs to be accomplished during off peak hours when LAN utilization is at its lowest. Which IBM Director component would be used to accomplis...
问题:单选题An x445 can withstand up to two failed memory chips per memory bank. In addition, the customer requires protection for a third memory chip failure on that bank. Which EXA feature will provide this extra level of protection?()A ChipkillB Hot Spare Memo...
问题:单选题A customer uses an IBM xSeries x366 for their network server.They experienced downtime when the NIC failed earlier this year.Their Novell 6.5 server needs to be accessible all the time at the highest speed possible.Slots are available where network ada...
问题:单选题A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller. Which of the following steps must be taken in order to validate the solution?()A Download t...
问题:单选题A customer has a file server using RAID-5 with 8KB sequential write operations. How should the disk controller cache be configured for optimal performance and data integrity?()A Use write-back cache with battery backup enabledB Use write-through cache...