单选题Software()referstothatthesoftwaretomeetthespecificationmustbeproduced.A testB supportC developmentD process

题目
单选题
Software()referstothatthesoftwaretomeetthespecificationmustbeproduced.
A

test

B

support

C

development

D

process


相似考题
更多“单选题Software()referstothatthesoftwaretomeetthespecificationmustbeproduced.A testB supportC developmentD process”相关问题
  • 第1题:

    ● Software (71) refers to that the software to meet the specification must be produced.

    (71)

    A. test

    B. support

    C. development

    D. process


    正确答案:C

  • 第2题:

    ●Ravi, like many project (71) ,had studied the waterfall model of software development as the primary software life-cycle (72) .He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (73) and not as (74) .

    The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice.To be the most suitable, an existing process must be (75) to the new problem.A

    development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

    (71) A.customers B.managers C.users D.administrators

    (72) A.activity B.procedure C.process D.progress

    (73) A.parts B.modules C.software D.a whole

    (74) A.parts B.modules C.software D.a whole

    (75) A.modified B.used C.suited D.tailored


    正确答案:B,C,A,D,D

  • 第3题:

    The development process in the software (74) involves four phases: analysis,design, implementation, and testing.

    A.maintenance

    B.lifecycle

    C.programming

    D.upgrading


    正确答案:B
    开发过程中的软件生命周期包括四个阶段:分析,设计,实现,测试。

  • 第4题:

    Software ______ refers to that the software to meet the specification must be produced.

    A.test

    B.support

    C.development

    D.Process

    A.

    B.

    C.

    D.


    正确答案:C

  • 第5题:

    The process whereby software is instaled into an operational environment is called ” (74) ”.

    A.deployment

    B.developmeni

    C.setup

    D.lay up


    正确答案:A
    软件安装到运行环境中去的过程称为部署

  • 第6题:

    Software( )refers to that the software to meet the specification must be produced.

    A.test
    B.support
    C.development
    D.process

    答案:C
    解析:
    软件开发指的是生产出满足规格说明书要求的软件。

  • 第7题:

    Software()referstothatthesoftwaretomeetthespecificationmustbeproduced.

    • A、test
    • B、support
    • C、development
    • D、process

    正确答案:C

  • 第8题:

    What is an advantage of multiple software process running in the Junos OS?()

    • A、Each process has its own protected memory space
    • B、Each process is started manually by the user at boot
    • C、Aall processes are dependent on each other
    • D、Multiple processes allow each routing protocol to be independent

    正确答案:A

  • 第9题:

    Which software process sorts client login requests and assigns them to a virtual router for RADIUS service?()

    • A、PPP
    • B、AAA
    • C、LCP
    • D、NCP

    正确答案:B

  • 第10题:

    单选题
    What is an advantage of multiple software processes running in the Junos OS?()
    A

    Each process has its own protected memory space

    B

    Each process is started manually by the user at boot

    C

    All processes are dependent on each other

    D

    Multiple processes allow each routing protocol to be independent


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    The Learning & Events section of Cisco.com contains information about certification and additionalCisco educational resources that enable you to further your professional opportunities. Whichprogram is detailed in Learning S Events?()
    A

     Software Application Support plus Upgrades

    B

     Cisco Partner Consultative Support

    C

     Cisco Networking Academy Program

    D

     Cisco Partner Specializations Program


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    What is an advantage of multiple software process running in the Junos OS?()
    A

    Each process has its own protected memory space

    B

    Each process is started manually by the user at boot

    C

    Aall processes are dependent on each other

    D

    Multiple processes allow each routing protocol to be independent


    正确答案: A
    解析: 暂无解析

  • 第13题:

    Developing reliable software on time and within(66)represents a difficult endeavor for many organizations.

    Usually business solutions have three main aspects: people,(67),and technology. The main reason for failing software projects has little to do with technology and tools, and much to do with lack of process(68). Experience has shown that introducing new technology and tools in an immature or undisciplined environment is likely to increase the chaos. CASE tools are not enough. "A fool with a tool is still a fool !"

    Structured method was the first wave of the software industry. This was the beginning of transforming software development from a"(69)industry" to mass production. Software process movement if the second wave in the software industry. The process maturity movement prepares the way for the third wave of the software industry :"software industrialization". Software development will become like an assembly and manufacturing process. A cfiticalenabling factor is adisciplined software engineering . process with predictable quality,(70)and functionality.

    A.forecast

    B.preparation

    C.budget

    D.economy


    正确答案:C

  • 第14题:

    Developing reliable software on time and within(31)represents a difficult endeavor for many organizations.Usually business solutions have three main aspects:people,(32), and technology. The main reason for failing software projects has little to do with technology and tools, and much to do with lack of process(33). Experience has shown that introducing new technology and tools in an immature or undisciplined environment is likely to increase the chaos. CASE tools are not enough. "A fool with a tool is still a fool?"Structured method was the first wave of the software industry. This was the beginning of transforming software development from a"(34)industry' to mass production. Software process movement if the second wave in the software industry. The process maturity movement prepares the way for the third wave of the software industry: "software industrialization". Software development will become like an assembly and manufacturing process. A critical enabling factor is a disciplined software engineering process with predictable quality,(35)and functionality.

    A.forecast

    B.preparation

    C.budget

    D.economy


    正确答案:C

  • 第15题:

    What is an advantage of multiple software process running in the Junos OS?()

    A. Each process has its own protected memory space

    B. Each process is started manually by the user at boot

    C. Aall processes are dependent on each other

    D. Multiple processes allow each routing protocol to be independent


    参考答案:A

  • 第16题:

    The process whereby software is instolled into an operational environment is called ¨(74) ¨.

    A.deployment

    B.developmeat

    C.setup

    D.layup


    正确答案:A
    将软件安装在运行环境中的过程称为部署。

  • 第17题:

    The process whereby software is installed into an operational environment is called ” ( ) ".


    A .deployment
    B .development
    C .setup
    D .lay up


    答案:A
    解析:
    将软件安装在运行环境中的过程称为部署。

  • 第18题:

    Software ( )refers to that the software to meet the specification must be produced.


    A. test
    B. support
    C. development
    D. process


    答案:C
    解析:
    软件开发指的是生产出满足规格说明书要求的软件。

  • 第19题:

    Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process. 空白(5)处应选择()

    • A、modified
    • B、used
    • C、suited
    • D、tailored

    正确答案:D

  • 第20题:

    Which of the following stages in the laser print process attracts toner to the latent image on the photoconductor?()

    • A、Writing
    • B、Fusing
    • C、Development
    • D、Transfer

    正确答案:C

  • 第21题:

    单选题
    Which of the following commands can be used to clean up a failed software installation process?()
    A

     installp -D

    B

     installp -d

    C

     installp -C

    D

     installp -c


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process. 空白(4)处应选择()
    A

    parts

    B

    modules

    C

    software

    D

    awhole


    正确答案: B
    解析: 参考译文:和许多项目经理一样,Ravi研究了作为主要软件生命周期过程的瀑布模型。他打算在首个任务,也就是即将开始的项目中使用瀑布模型。但是,他发现瀑布模型不能满足要求,原因是客户希望软件分阶段交付,也就意味着系统必须一部分一部分地交付和构建,而不是作为一个整体进行。这种情况在很多其他项目中也类似。现实世界中,很难有一种标准的过程或在前期的项目中使用的过程作为目前项目的最佳选择。对于大部分情况,必须对已存在的过程进行调整,以适应新的问题。但是,即使经过调整,一个开发过程也很难处理变化的需求。为了适应变化的需求而不失去对项目的控制,你必须用需求变更管理过程从而对开发过程进行补充。

  • 第23题:

    单选题
    Which software process sorts client login requests and assigns them to a virtual router for RADIUS service?()
    A

    PPP

    B

    AAA

    C

    LCP

    D

    NCP


    正确答案: D
    解析: 暂无解析

  • 第24题:

    单选题
    The Training and Events section of Cisco.com contains information about certification andadditional Cisco educational resources that enable you to further your professional opportunities.Which program is found in Training and Events?()
    A

     Software Application Support plus Upgrades

    B

     Cisco Partner Consultative Support

    C

     Partner E-Leaming Connection

    D

     Cisco Partner Specializations Program


    正确答案: D
    解析: 暂无解析