多选题In the network, VLAN Trunking Protocol (VTP) is running with a domain name of R1. VLANs 1, 2,3, 4, 5, 10, 20 are active on the network. Suddenly the whole network goes down. No traffic isbeing passed on VLANs 2, 3, 4, 5, 10, 20. However, traffic passes

题目
多选题
In the network, VLAN Trunking Protocol (VTP) is running with a domain name of R1. VLANs 1, 2,3, 4, 5, 10, 20 are active on the network. Suddenly the whole network goes down. No traffic isbeing passed on VLANs 2, 3, 4, 5, 10, 20. However, traffic passes on VLAN 1 and indicates allswitches are operational. Right before the network problem occurred; a switch named SW13 wastaken out of the lab and added to the network. What three configuration issues on SW13 could becausing the network outage?()
A

SW13 has a higher VTP configuration revision than the current VTP revision

B

SW13 is configured as a VTP server with a different domain name

C

SW13 is configured as a VTP server with the domain name R1

D

SW13 has a lower VTP configuration revision than the current VTP revision

E

SW13 is not configured to participate in VTP

F

SW13 is configured with only VLAN1


相似考题
更多“多选题In the network, VLAN Trunking Protocol (VTP) is running with a domain name of R1. VLANs 1, 2,3, 4, 5, 10, 20 are active on the network. Suddenly the whole network goes down. No traffic isbeing passed on VLANs 2, 3, 4, 5, 10, 20. However, traffic passes”相关问题
  • 第1题:

    Which of the following can be an expected outcome of a VLAN?()

    A. VLANs logically divide a switch into multiple, independent switches at Layer 2.

    B. Trunk links can carry traffic for multiple VLANs.

    C. VLAN implementation significantly increases traffic due to added trunking information.

    D. VLANs can span multiple switches.

    E. VLANs typically decrease the number of switches needed


    参考答案:A, B, D

  • 第2题:

    To configure the VLAN trunking protocol to communicate VLAN information between two switches, what two requirements must be met?()

    A. Each end of the trunk line must be set to IEEE 802.1E encapsulation.

    B. The VTP management domain name of both switches must be set the same.

    C. All ports on both the switches must be set as access ports.

    D. One of the two switches must be configured as a VTP server.

    E. A rollover cable is required to connect the two switches together.

    F. A router must be used to forward VTP traffic between VLANs.


    参考答案:B, D

  • 第3题:

    In the network, VLAN Trunking Protocol (VTP) is running with a domain name of R1. VLANs 1, 2,3, 4, 5, 10, 20 are active on the network. Suddenly the whole network goes down. No traffic isbeing passed on VLANs 2, 3, 4, 5, 10, 20. However, traffic passes on VLAN 1 and indicates allswitches are operational. Right before the network problem occurred; a switch named SW13 wastaken out of the lab and added to the network. What three configuration issues on SW13 could becausing the network outage?()

    • A、SW13 has a higher VTP configuration revision than the current VTP revision
    • B、SW13 is configured as a VTP server with a different domain name
    • C、SW13 is configured as a VTP server with the domain name R1
    • D、SW13 has a lower VTP configuration revision than the current VTP revision
    • E、SW13 is not configured to participate in VTP
    • F、SW13 is configured with only VLAN1

    正确答案:A,C,F

  • 第4题:

    A VTP domain has six active VLANs. Without notice, all VLANs except VLAN1 fail. Just prior tothe failure, Switch2 was added to the network. Which three issues on Switch2 could be the cause?()

    • A、Switch2 is configured for only VLAN1
    • B、Switch2 is a VTP server in a different domain
    • C、Switch2 is a VTP server in the Company domain
    • D、Switch2 is not a VTP domain.
    • E、Switch2 has a lower VTP configuration revision number than the current VTP revision
    • F、Switch2 has a higher VTP configuration revision number than the current VTP revision

    正确答案:A,C,F

  • 第5题:

    What are some of the characteristics of a typical VLAN arrangement?()

    • A、VLANs logically divide a switch into multiple, independent switches at Layer 2.
    • B、Trunk links can carry traffic for multiple VLANs.
    • C、VLAN implementation significantly increases traffic due to added trunking information.
    • D、A VLAN can span multiple switches.
    • E、VLANs typically increase the number of switches needed
    • F、VLANs typically decrease the number of switches needed

    正确答案:A,B,D

  • 第6题:

    You are the network administrator of a Layer 3 switched network. Users in one VLAN are complaining thataccess to the server VLAN is very slow from time to time. Traffic in the local VLAN works without any issue,and users in other VLANs do not have any complaint to reach the server VLAN. What is most likely thecause of this issue?()

    • A、routing issue
    • B、denial-of-service attack
    • C、MAC flooding
    • D、spanning-tree recalculation
    • E、Layer 2 loop
    • F、ARP spoofing attack

    正确答案:F

  • 第7题:

    Before inserting a new switch in the network,the network administrator checks that the VTP domain name is correct,the VTP mode is set to server, and revision is lower than the switches in the network. The administrator then configures interfaces and trunks,erases existing VLANs,and connects the switch to the network. Following that procedure,there is no connectivity in the network. What is a possible cause of this problem?()

    • A、Because the configuration revision of the new switches is lower than the rest of the network, it can change the VLAN database of the other switches.
    • B、As a VTP server, the new switch deleted all VLANs of the network.
    • C、Erasing VLANs increases the VTP configuration revision.
    • D、Since the configuration revision of the network is higher than the new switch, the VLAN database was automatically synchronized.

    正确答案:C

  • 第8题:

    What is the purpose of the cisco Vlan Trunking protocol?()

    • A、to provide a mechanism to dynamically assign vlan membership to switch ports
    • B、to allow traffic to be carried from multiple vlans over a single link between switches
    • C、to allow native vlan information to be carried over a trunk link
    • D、to provide a mechanism to manually assign vlan membership to switch ports
    • E、to allow for managing the additions,deletions,and changes of vlans between switchs

    正确答案:E

  • 第9题:

    多选题
    To configure the VLAN trunking protocol to communicate VLAN information between two switches, what two requirements must be met?()
    A

    Each end of the trunk line must be set to IEEE 802.1E encapsulation.

    B

    The VTP management domain name of both switches must be set the same.

    C

    All ports on both the switches must be set as access port.

    D

    One of the two switches must be configured as a VTP server.

    E

    A rollover cable is required to connect the two switches together.

    F

    A router must be used to forward VTP traffic between VLANs.


    正确答案: A,D
    解析: 暂无解析

  • 第10题:

    多选题
    The Company switches are configured to use VTP. What’s true about the VLAN trunking protocol  (VTP)?()
    A

    VTP messages will not be forwarded over nontrunk links.

    B

    VTP domain names need to be identical. However,case doesn’t matter.

    C

    A VTP enabled device which receives multiple advertisements will ignore advertisements with higher configuration revision numbers.

    D

    A device in transparent VTP v.1 mode will not forward VTP messages.

    E

    VTP pruning allows switches to prune VLANs that do not have any active ports associated with  them.


    正确答案: C,B
    解析: 暂无解析

  • 第11题:

    单选题
    Switch R1 is part of the Company VTP domain. What’s true of VTP Pruning within this domain?()
    A

    It does not prune traffic from VLANs that are pruning-ineligible

    B

    VLAN 1 is always pruning-eligible

    C

    It will prune traffic from VLANs that are pruning-ineligible

    D

    VLAN 2 is always pruning-ineligible

    E

    None of the other alternatives apply


    正确答案: A
    解析: 暂无解析

  • 第12题:

    多选题
    In a customer’s network, VLAN Trunking Protocol (VTP) is running with a domain named main1. VLANs 1,2,3,4,5,10,20 are active on the network. Suddenly the whole network goes down. No traffic is being passed on VLANs 2,3,4,5,10,20, however traffic passes on VLAN 1 and indicates all switches are operational. Right before the network problem occurred, a switch named TEST1 was added to the network.  What three configuration issues on TEST1 could be causing the network outage?()
    A

    TEST1 is configured as a VTP server with a different domain name.

    B

    TEST1 is not configured to participate in VTP.

    C

    TEST1 is configured as a VTP server with the domain name main1.

    D

    TEST1 has a lower VTP configuration revision than the current VTP revision.

    E

    TEST1 has a higher VTP configuration revision than the current VTP revision.

    F

    TEST1 is configured with only VLAN1.


    正确答案: F,E
    解析: 暂无解析

  • 第13题:

    Inthenetwork,VLANTrunkingProtocol(VTP)isrunningwithadomainnameofR1.VLANs1,2,3,4,5,10,20areactiveonthenetwork.Suddenlythewholenetworkgoesdown.NotrafficisbeingpassedonVLANs2,3,4,5,10,20.However,trafficpassesonVLAN1andindicatesallswitchesareoperational.Rightbeforethenetworkproblemoccurred;aswitchnamedSW13wastakenoutofthelabandaddedtothenetwork.WhatthreeconfigurationissuesonSW13couldbecausingthenetworkoutage?()


    参考答案:A, C, F

  • 第14题:

    In a customer’s network, VLAN Trunking Protocol (VTP) is running with a domain named main1. VLANs 1,2,3,4,5,10,20 are active on the network. Suddenly the whole network goes down. No traffic is being passed on VLANs 2,3,4,5,10,20, however traffic passes on VLAN 1 and indicates all switches are operational. Right before the network problem occurred, a switch named TEST1 was added to the network.  What three configuration issues on TEST1 could be causing the network outage?()

    • A、TEST1 is configured as a VTP server with a different domain name.
    • B、TEST1 is not configured to participate in VTP.
    • C、TEST1 is configured as a VTP server with the domain name main1.
    • D、TEST1 has a lower VTP configuration revision than the current VTP revision.
    • E、TEST1 has a higher VTP configuration revision than the current VTP revision.
    • F、TEST1 is configured with only VLAN1.

    正确答案:C,E,F

  • 第15题:

    When you create a network implementation VLAN solution, what is one procedure that you should include in your plan?()

    • A、Perform an incremental implementation of components.
    • B、Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
    • C、Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
    • D、Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.

    正确答案:A

  • 第16题:

    The Company switches are configured to use VTP. What’s true about the VLAN trunking protocol  (VTP)?()

    • A、VTP messages will not be forwarded over nontrunk links.
    • B、VTP domain names need to be identical. However,case doesn’t matter.
    • C、A VTP enabled device which receives multiple advertisements will ignore advertisements with higher configuration revision numbers.
    • D、A device in "transparent" VTP v.1 mode will not forward VTP messages.
    • E、VTP pruning allows switches to prune VLANs that do not have any active ports associated with  them.

    正确答案:A,D

  • 第17题:

    You are troubleshooting a Catalyst 5000 trunk in the network. What should you do if there’s adisagreement about the VLANs configured to use the trunk?()

    • A、Reload the active VLAN configuration
    • B、Clear the affected port and bring it up again
    • C、Explicitly set the trunk for the VLAN to be on
    • D、Remove all the VLANs set

    正确答案:B

  • 第18题:

    Switch R1 is configured to use the VLAN Trunking Protocol (VTP). What does R1 advertise in its VTP domain?()

    • A、The VLAN ID of all known VLANs,the management domain name,and the total number of trunk links on the switch.
    • B、The VLAN ID of all known VLANs,a 1-bit canonical format (CF1 Indicator),and the switch  configuration revision number.
    • C、The management domain name,the switch configuration revision number,the known VLANs,  and their specific parameters.
    • D、A 2-byte TPID with a fixed value of 0x8100 for the management domain number,the switch  configuration revision number,the known VLANs,and their specific parameters.
    • E、None of the other alternatives apply.

    正确答案:C

  • 第19题:

    Switch R1 is part of the Company VTP domain. What’s true of VTP Pruning within this domain?()

    • A、It does not prune traffic from VLANs that are pruning-ineligible
    • B、VLAN 1 is always pruning-eligible
    • C、It will prune traffic from VLANs that are pruning-ineligible
    • D、VLAN 2 is always pruning-ineligible
    • E、None of the other alternatives apply

    正确答案:A

  • 第20题:

    多选题
    You are a senior network administrator at TestKing and your trusty junior administrator tells you that he failed his task of adding VLAN 50 to a Catalyst switch in the network. You enter in the 'show vtp status' command and get this output: TK2# show vtp status VTP Version :2 Configuration Revision :7 Maximum VLANs supported local :68 Number of existing VLANs :8 VTP Operating Mode :Client VTP Domain Name :corp VTP Pruning Mode :Disabled VTP V2 Mode :Disabled VTP Traps Generation :Disabled MD5 digest :0x22 0xF3 0x1A Configuration last modified by 172.18.22.15 at 5-28-03 1t:53:20 What commands must be issued on this switch to add VLAN 50 to the database?()
    A

    TK2(config-if)# switchport access vlan 50

    B

    TK2(vlan)# vtp server

    C

    TK2(config)# config-revision 20

    D

    TK2(config)# vlan 50 name Tech

    E

    TK2(vlan)# vlan 50

    F

    TK2(vlan)# switchport trunk vlan 50


    正确答案: A,E
    解析: 暂无解析

  • 第21题:

    多选题
    In the network, VLAN Trunking Protocol (VTP) is running with a domain name of R1. VLANs 1, 2,3, 4, 5, 10, 20 are active on the network. Suddenly the whole network goes down. No traffic isbeing passed on VLANs 2, 3, 4, 5, 10, 20. However, traffic passes on VLAN 1 and indicates allswitches are operational. Right before the network problem occurred; a switch named SW13 wastaken out of the lab and added to the network. What three configuration issues on SW13 could becausing the network outage?()
    A

    SW13 has a higher VTP configuration revision than the current VTP revision

    B

    SW13 is configured as a VTP server with a different domain name

    C

    SW13 is configured as a VTP server with the domain name R1

    D

    SW13 has a lower VTP configuration revision than the current VTP revision

    E

    SW13 is not configured to participate in VTP

    F

    SW13 is configured with only VLAN1


    正确答案: D,A
    解析: 暂无解析

  • 第22题:

    单选题
    What is the purpose of the cisco Vlan Trunking protocol?()
    A

    to provide a mechanism to dynamically assign vlan membership to switch ports

    B

    to allow traffic to be carried from multiple vlans over a single link between switches

    C

    to allow native vlan information to be carried over a trunk link

    D

    to provide a mechanism to manually assign vlan membership to switch ports

    E

    to allow for managing the additions,deletions,and changes of vlans between switchs


    正确答案: B
    解析: 暂无解析

  • 第23题:

    多选题
    A VTP domain has six active VLANs. Without notice, all VLANs except VLAN1 fail. Just prior tothe failure, Switch2 was added to the network. Which three issues on Switch2 could be the cause?()
    A

    Switch2 is configured for only VLAN1

    B

    Switch2 is a VTP server in a different domain

    C

    Switch2 is a VTP server in the Company domain

    D

    Switch2 is not a VTP domain.

    E

    Switch2 has a lower VTP configuration revision number than the current VTP revision

    F

    Switch2 has a higher VTP configuration revision number than the current VTP revision


    正确答案: D,B
    解析: 暂无解析

  • 第24题:

    单选题
    Switch R1 is configured to use the VLAN Trunking Protocol (VTP). What does R1 advertise in its VTP domain?()
    A

    The VLAN ID of all known VLANs,the management domain name,and the total number of trunk links on the switch.

    B

    The VLAN ID of all known VLANs,a 1-bit canonical format (CF1 Indicator),and the switch  configuration revision number.

    C

    The management domain name,the switch configuration revision number,the known VLANs,  and their specific parameters.

    D

    A 2-byte TPID with a fixed value of 0x8100 for the management domain number,the switch  configuration revision number,the known VLANs,and their specific parameters.

    E

    None of the other alternatives apply.


    正确答案: A
    解析: 暂无解析