U-size templates
Phase changers
Baffles
Molex connectors
第1题:
After a server has been installed into a rack, an administrator must ensure which of the following?()
第2题:
Which of the following channels air flow through a server chassis?()
第3题:
Which of the following BEST describes a server where several physical server chassis are housed within an enclosure to share some redundant resources?()
第4题:
Which of the following components channels air flow through a server chassis?()
第5题:
Which of the following ensures the MOST secure access to a server room?()
第6题:
DAS
NAS
SAN
WORM
第7题:
Tower server
Rack mount server
Blade server
Bare metal server
第8题:
ID card readers
Server rack doors
Biometric devices
Locked doors
第9题:
Blade server
Tower converted to rack server
Tower server
Rack server
第10题:
Fan
Heat sink
Shroud
Radiator
第11题:
Bare metal server
Tower server
Rack mounted server
Blade server
第12题:
Tower server
Bare metal server
Blade server
Rack server
第13题:
Which of the following connectors uses the main board ATX connector type?()
第14题:
Which of the following is the MOST space efficient server chassis type within a server rack?()
第15题:
Which of the following cable types is rated to be run through air ducts?()
第16题:
In which phase should a TDA be performed of the following?()
第17题:
Server deployment
Installation and server configuration
Problem determination / resolution
Needs analysis and design
第18题:
STP
Plenum
PVC
UTP
第19题:
Warm air flow is permitted through the front bezel
The system is labeled so that it can be identified
Verify the change control process can be implemented
Determine the correct power requirements
第20题:
Fan
Heat sink
Shroud
Radiator
第21题:
Fans
Ducts
Heat sinks
Condensers
第22题:
U-size templates
Phase changers
Baffles
Molex connectors
第23题:
Tower server
Rack mount server
Blade server
Bare metal server
第24题:
Holding the valve open for a long period
Increasing the starting air pressure used
Opening the stating air valve quickly
Reducing the starting air valve size