relight the boiler immediately to prevent loss of steam pressure
relight the fire off the brickwork as the bricks are cherry red
purge the furnace of any combustible gases before attempting to relight the fire
speed up the feed pump to prevent dry firing when the burner flame is reestablished
第1题:
What happens on failure of a pre or post event script?()
第2题:
为方便分析和找到问题,在EVENT窗口一般会选择哪些选项()
第3题:
Reverse current protection
Reverse power protection
Synchronising device
Frequency meter
第4题:
The error is logged and HA will continue processing
If configured, a recovery command will be run to deal with the problem
An event error is generated and 3 minutes later the cluster will enter config_too_long state
An event error is generated and 6 minutes later the cluster will enter config_too_long state
第5题:
relight the boiler immediately to prevent loss of steam pressure
relight the fire off the brickwork as the bricks are cherry red
purge the furnace of any combustible gases before attempting to relight the fire
speed up the feed pump to prevent dry firing when the burner flame is reestablished
第6题:
The safety valve escape piping should be disconnected from the valve body and a blank inserted
The boiler vent valves should be opened
All handhole/manhole covers should be tightened up as much as possible to preclude any leaks
All of the above
第7题:
fuel manifold
lubricating pipe line
auxiliary engine pipe line
generator output line
第8题:
steam demand is high
salinity is high
safety valve simmers
burner flame is extinguished
第9题:
clean the flame scanner photocell window
Inspect and clean all solenoid valves
lift the safety valves by hand
Inspect for oil or water leaks
第10题:
air or water in the furnace
combustion pulses
fuel oil pump failure
flame failure
第11题:
increased fuel consumption
increased feed water consumption
fuel pump failure
combustion control system failure
第12题:
incorrect electrode setting
incorrect nozzle position
clogged fuel nozzle
broken high tension lead
第13题:
失效时间failure event
第14题:
While reviewing the hacmp.out after a node failure,an administrator realizes that the custom Event queue_down did not execute. The queue_down event shows up when a list of custom events is displayed. What would be the next logical step to resolve this problem?()
第15题:
in the event of a flame failure
in the event of a stack fire
when the water level reach the crown sheet
when the feed pump discharge pressure drops to a preset minimum
第16题:
The safety valve escape piping should be disconnected from the valve body and a blank inserted
The boiler vent valves should be opened
All hand-hole/manhole covers should be tightened up as much as possible to preclude any leaks
All of the above
第17题:
operating the boiler at less than normal water level
installing fins on the firesides of water-tubes
increasing the amount of excess air to the burners
treating the boiler water with chemical oxygen scavengers
第18题:
fuel oil supply temperature is normal
burner electrode is incorrectly positioned
fuel/air ratio is incorrect
ignition current is too low
第19题:
a glazed surface on the spring
nicks in the protective coating
a build up of sludge deposits
cracks in the surface of the spring
第20题:
water
voltage
fuel pressure
steam pressure
第21题:
air supply is shut off
fuel supply is shut off
water supply is shut off
safety valve lifts
第22题:
carbon deposits on the flame scanner
high fuel oil temperature
low fuel oil viscosity
high steam pressure
第23题:
completely drain the boiler in an emergency
prevent sludge from forming in the drum
remove floating impurities from the boiler water surface
remove settled solids from the water drum
第24题: