Each line has a large ()at the end.A、holeB、eye spliceC、ring headD、chain

题目

Each line has a large ()at the end.

  • A、hole
  • B、eye splice
  • C、ring head
  • D、chain

相似考题
更多“Each line has a large ()at the end.A、holeB、eye spliceC、ring headD、chain”相关问题
  • 第1题:

    Each line has a large eye splice().

    • A、in the end
    • B、on the end
    • C、at the end
    • D、to the end

    正确答案:C

  • 第2题:

    A customer has four AIX partitions that require a SAN. The disk subsystem must replicate to aremote site via an IP network. Each site has two Cisco MDS 9509 directors with fibre channel linecards. Which of the following must be added to each director to meet the IP requirement?()

    • A、tri-rate SFP
    • B、update to the latest Cisco IOS
    • C、FCIP activation on the existing 16 FC line cards
    • D、Multiprotocol Services Module with FCIP activation

    正确答案:D

  • 第3题:

    Each line has a large()(琵琶头)at the end.

    • A、hole
    • B、eye splice
    • C、ring head
    • D、chain

    正确答案:B

  • 第4题:

    Each line has a large eye splice at the end. The eye is placed over a ().

    • A、bit
    • B、guard
    • C、quay
    • D、bollard

    正确答案:D

  • 第5题:

    A customer has 15 IBM x365 servers in a rack environment and is using IBM Director for systems management.  They require the ability to restart any server independent of the operating system.  Which of the following is the most cost-effective solution?()

    • A、Interconnect the service processors and use the IBM Director Agent
    • B、Install RSA II in each server and chain together the systems management processors
    • C、Install the RSA II in the top server and chain together the service processor interconnect
    • D、Install the IBM Director Agent on each server and use the remote control function to restart the servers

    正确答案:C

  • 第6题:

    单选题
    Each line has a large()(琵琶头)at the end.
    A

    hole

    B

    eye splice

    C

    ring head

    D

    chain


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    When anchoring,good practice requires 5 to 7 fathoms of chain for each fathom of depth. In deep water you should use().
    A

    the same ratio

    B

    more chain for each fathom of depth

    C

    less chain for each fathom of depth

    D

    two anchors with the same ratio of chain


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().
    A

    increase fatigue life of the system

    B

    reduce the time to retrieve the line

    C

    increase the holding power

    D

    reduce the catenary


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    On a ship,how many ring buoys are required to have a buoyant line attached?()
    A

    One ring life buoy

    B

    One ring life buoy on each side of the ship

    C

    Three ring life buoys

    D

    Two ring life buoys on each side of the ship


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    The length of chain between the anchor and the end of the pendant line is called the().
    A

    pigtail chain

    B

    thrash chain

    C

    crown chain

    D

    wear chain


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Each line has a large ()at the end.
    A

    hole

    B

    eye splice

    C

    ring head

    D

    chain


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    Each line has a large eye splice().
    A

    in the end

    B

    on the end

    C

    at the end

    D

    to the end


    正确答案: A
    解析: 暂无解析

  • 第13题:

    ()means that every project has a definite beginning and a definite end.

    • A、Project phase
    • B、Unique
    • C、Temporary
    • D、Closure

    正确答案:B

  • 第14题:

    ()means that every project has a definite beginning and a definite end.

    • A、Projectphase
    • B、Unique
    • C、Temporary
    • D、Closure

    正确答案:C

  • 第15题:

    If there is another line already on the bollard ,the eye of the second line should be()before placing it over the bollard.

    • A、taken up through the eye of the first line
    • B、taken up over the eye of the first line
    • C、made fast to the first line
    • D、taken up from the eye of the first line

    正确答案:A

  • 第16题:

    What protection method is used in 4F MS-SPRing networks?()

    • A、 Each fiber has half of its capacity reserved for protection.
    • B、 Two fibers carry their full capacities while the other two fibers are reserved for protection.
    • C、 The signal is sent simultaneously in both directions around the ring. The receiver determines which fiber to listen to based on signal quality.
    • D、 The signal is sent simultaneously in both directions around the ring. The transmitter determines which fiber has the working bit set for the receiver to acknowledge.

    正确答案:B

  • 第17题:

    A customer currently has a large group of older 1U servers. Each dedicated to aunique application. Quick provisioning of the servers is important to the customer. Which of the following approaches addresses this situation?()

    • A、Virtualization
    • B、Replace each server with energy efficient servers
    • C、Upgrade in place to improve performance
    • D、Implement BladeCenter

    正确答案:A

  • 第18题:

    单选题
    Two mooring lines may be placed on the same bollard and either one cast off first if().
    A

    the eye of the second line is dipped

    B

    the mooring lines are doubled

    C

    the bollard has two horns

    D

    one of the lines is a breast line


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    The holding power of an anchor increases when the().
    A

    amount of chain lying along the bottom increases

    B

    length of the catenary is reduced

    C

    mooring line tension is increased

    D

    amount of chain lying along the bottom decreases


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    If two mooring lines are to be placed on the same bollard,which method is BEST?().
    A

    Place the eye from the forward line on the bollard and then place the eye from the second line directly over the first

    B

    It makes no difference how the lines are placed

    C

    Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollard

    D

    Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    Which statement is TRUE about placing the eyes of two mooring lines on the same bollard?()
    A

    Put one line at the low point and one at the high point of the bollard so they don't touch

    B

    Take the eye of the second line up through the eye of the first line before putting the second line on the bollard

    C

    Never put two mooring lines on the same bollard

    D

    The mooring line forward should be put on the bollard first


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    In large, low-speed, main propulsion diesel engine, position ring groove wear usually occurs at the()
    A

    top of the ring groove

    B

    back of the ring groove

    C

    bottom of the ring groove

    D

    piston ring end clearance


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    Each line has a large eye splice at the end. The eye is placed over a ()(系缆桩) .
    A

    bit

    B

    guard

    C

    quay

    D

    bollard


    正确答案: B
    解析: 暂无解析